Why in-house fabrication matters
Making our own steel means we control quality, programme and price. There is no fabricator’s queue between your order and your steel, and the people who draw it, make it and install it talk to each other every day.
The workshop runs under our BS EN 1090-1 factory production control, so every structural piece is traceable from mill certificate to delivery.
Plant and equipment
| Item | Qty | Use |
|---|---|---|
| CNC plasma cutting tables | 2 | Plates, base plates, gussets and profiles |
| 500 A welding sets | 2 | Structural and fabrication welding |
| Engine-driven welder generator | 1 | Site welding away from mains power |
| Linde R14S reach truck | 1 | Loading and moving steel |
| Three-phase supply | — | Powers the cutting and welding plant. NICEIC Electrical Installation Certificate issued October 2026 |
Welding processes: MIG/MAG and MMA. Material grades: S275, S355 and stainless 304/316.
Send us your drawings
Upload drawings, specifications or a BoQ and get a free, itemised quotation within 48 hours.
