Tonnage and number of pieces
More pieces mean more cutting, drilling and welding, even at the same weight.
Connections
Simple bolted connections are quicker than complex welded ones.
Finish
Primer, galvanising, powder coat or intumescent each add a different cost.
Site access
Tight access, cranes, out-of-hours work or manual handling change installation time.
Programme
Phased deliveries and multiple visits add cost compared with one visit.
Information
Complete drawings mean fewer assumptions in the price.
Send us your drawings