Free quotation within 48 hours · Fabricated in-house in Ash, Sevenoaks

020 3633 8372WhatsApp 07411 243225

EN

Pricing

What affects price

Every job is priced individually. These are the main things that move the number.

Tonnage and number of pieces

More pieces mean more cutting, drilling and welding, even at the same weight.

Connections

Simple bolted connections are quicker than complex welded ones.

Finish

Primer, galvanising, powder coat or intumescent each add a different cost.

Site access

Tight access, cranes, out-of-hours work or manual handling change installation time.

Programme

Phased deliveries and multiple visits add cost compared with one visit.

Information

Complete drawings mean fewer assumptions in the price.

Send us your drawings

Upload drawings, specifications or a BoQ and get a free, itemised quotation within 48 hours.

Call WhatsApp Free quote