| Does each quote cover the same items, from the same drawings and revision? | |
| Primer, galvanising, powder coat and fire protection: included or excluded? | |
| Who designs the connections, and is it priced? | |
| Erection, plant, cranes and access equipment included? | |
| Who provides unloading, storage, power and welfare? | |
| Do the dates and number of visits match yours? | |
| Drawings, RAMS, certificates and handover file included? | |
| Is structural steel UKCA marked under BS EN 1090-1? | |
| How long is each price valid? |
Send us your drawings
Upload drawings, specifications or a BoQ and get a free, itemised quotation within 48 hours.
