Free quotation within 48 hours · Fabricated in-house in Ash, Sevenoaks

020 3633 8372WhatsApp 07411 243225

EN

Homeowners

Your steel beam journey

From first idea to signed-off steel, step by step.

  1. 01

    Talk to an engineer

    A structural engineer designs the beams, padstones and connections and gives you calculations.

  2. 02

    Building control

    Building control (council or approved inspector) checks the design and inspects the work.

  3. 03

    Party wall notices

    If steel bears on a shared wall, serve notices on your neighbours early.

  4. 04

    Send us the drawings

    We send a free itemised quote within 48 hours of receiving the engineer’s drawings.

  5. 05

    Survey and drawings

    We check sizes on site if needed and confirm lengths and connections.

  6. 06

    Fabrication

    We make the steel in our Ash workshop, primed or galvanised as specified.

  7. 07

    Delivery and fitting

    Your builder or our team installs the steel; building control inspects.

  8. 08

    Handover

    You get the certificates for your building control file.

Send us your drawings

Upload drawings, specifications or a BoQ and get a free, itemised quotation within 48 hours.

Call WhatsApp Free quote